Chapel Hill Cooperative Preschool

Quick Stats
  • Location: Chapel Hill, NC
  • Cost: $2,425,894
  • Size: 8,624 sf.
  • Year: 2019-2020
  • Duration:  300 days
  • Owner: Chapel Hill Community Preschool
  • Architect/Engineer: Center Studio Architects
Read More
Barton College eSports Emblem

Barton College E Sports

This small renovation and fit-up converted an existing meeting space into a full-service eSports venue for students to engage in online gaming. Quick Stats
  • Location: Wilson, NC
  • Cost: $113,508
  • Size: 2,500 sf.
  • ... Read More
Barton College Wilson Gym Aerial

Barton College Wilson Gym

Over the summer, the school had the existing gym floor, bleachers, mechanical and electrical systems removed. As part of the renovation, a new concrete slab was poured, athletic wood flooring ... Read More
BARTON ATHLETICS 1

Barton Athletics Sports Center

This project consisted of a renovation to an existing 6,000 sf metal building in order to create an athletic training facility for Barton College athletes. The college can now use ... Read More
TRIANGLE DAY SCHOOL CANOPY

Triangle Day School Classroom

Quick Stats
  • Location: Durham, NC
  • Cost: $1,995,496
  • Size: 12,000 sf
  • Year: 2017-2018
  • Duration: 246 days (projected)
  • Owner: Triangle Day School
  • Architect/Engineer: Brockwell Associates
Read More

UNC Student Store

This was a fast-track project with a significant amount of work to be completed in a short time frame. The project team worked shifts of 12-hour days, seven days a ... Read More
KIPP BUS LOT

KIPP Durham College Preparatory School

The first phase of this project involved modifying the existing gym building to house four temporary classrooms that the school could use during construction of the main building. The existing gym floor was protected ... Read More